The Board In The House Is Rarely The Only One
Sedgley sits high and its houses tend to come with extras — a cellar beneath the front room, a detached garage at the end of a long drive, a workshop or a garden room added later on. Somewhere along the way each of those picked up a supply, and in a surprising number of cases that supply turns out to be a length of cable pushed through a wall from the nearest socket. Changing the unit in the house is a good moment to sort out whatever hangs off it, because a small board at the far end of a cable is only ever as sound as the arrangement feeding it.
A separate building — garage, workshop, garden room, even a large shed with a freezer humming in it — wants a dedicated circuit from the main board, run in cable that suits being outside and underground, and terminated in a small board of its own at the far end. What we tend to find instead is an extension lead that became permanent, or a cable teed off a socket circuit and pushed through the wall. It usually works. It is not protected the way it should be, it will show up on any inspection, and it is the thing most likely to cause a nuisance trip that takes half the house down with it.
Cellars raise points of their own. A board or a run of circuits down there is not automatically wrong, but the space is often damp, badly lit and full of things stacked in front of whatever needs reaching. Where a second board lives in a cellar we look at how it is fed, whether it can be got at, and whether the lighting down there is any use in a hurry — because that is the one circuit you genuinely need working the evening you go down to look at something.
When the main unit is changed we also look at whether faults will land where they ought to. With a small board at the end of a sub-main, a problem in the workshop should switch the workshop off, not the house. That is a matter of choosing devices that work together, and it is far easier to build in during a change than to retrofit later. There is a fuller description on the fuse board replacement service page. Where the outbuildings are an unknown quantity, an EICR in Sedgley is the sensible starting point; otherwise see what else we take on as an electrician in Sedgley, or the EV charger installation in Sedgley and house rewire in Sedgley pages. Free quotes, no obligation.
The unit indoors, and all the supplies it quietly feeds beyond the back door.

A dedicated circuit leaving the main board, in cable rated for the route it takes and buried or clipped as it should be. Not a socket circuit extended through a wall and hoped for.

Outbuildings deserve their own means of isolation and their own protection, so that work out there can happen without trekking back to the house, and a problem stays where it began.

Whether a cellar board can actually be reached, how it is fed, and whether the lighting down there works when you need it. Damp and clutter both count against a board's position.

Devices chosen so that a problem at the far end operates the protection at the far end. It is the difference between a dark workshop and a house with no power on a winter evening.

Every circuit tested including the sub-main, the figures recorded on an Electrical Installation Certificate, a schedule left inside the lid, and the notification made on our registration.
Four stages — and yes, that does mean walking down to the garage before quoting.
The main board, what it feeds, and a walk out to the garage, workshop or garden room to see how the supply actually gets there.
The unit and its ways, any sub-main that needs putting right, and a small board at the far end where one is wanted — each priced separately so you can choose.
Some of it can wait and we will say which. The board change and the outbuilding supply need not happen the same day if the budget says otherwise.
New unit fitted, circuits reconnected and labelled, sub-mains tested alongside everything else, and the certificate plus notification dealt with at the end.
Fuse boards, inspections, rewires and chargers all get done by the same electrician in Sedgley; the towns either side get the same fuse board service.
Common ground when we are quoting a board change and the outbuildings that hang off it.
It is very common and it is not how it should be done. A separate building wants its own circuit from the board, in cable suited to the route, with somewhere to isolate it at the far end. We will price putting that right and let you decide when.
If the building has more than a light and one socket, yes, it earns its place. It gives you isolation out there and stops a fault in the workshop taking the house with it. For a single light, a properly run circuit may well be enough.
Sometimes. It depends on how it is fed, what condition it is in and whether you can get to it. Damp, clutter and poor lighting all count against it, and a cellar board that cannot be reached in a hurry is not doing its job.
Usually because the protection is not coordinated, so the device nearest the fault is not the one that operates. Choosing devices that work together during a board change is the practical fix, and it is far cheaper done then.
Yes it is. Changing a consumer unit has to be notified to building control, and we do that under the Competent Person Scheme through our NAPIT registration. You keep the certificate; the notification never becomes your problem.
Usually, and it is generally the cheaper way round because the board is open anyway. We will quote the two parts separately so you can see what each costs, and split them across visits if you would rather.
Real reviews from customers across Wolverhampton & the West Midlands. You deal directly with Adam, every time.
Called Sunday afternoon to ask about replacing our bathroom light switch — he came to fix it a couple of hours later. Fabulous job.
Came to me to check the electrics and make sure all is safe in a shed I built in the garden. Did a very thorough job! Very friendly and professional.
Fitted a new plug for me after another company who had fitted my appliance caused water to leak into the old wall plug. He arrived within half an hour of being called and completed the job in no time.
Adam is an excellent electrician — very reliable, professional, clean and tidy throughout his work. Arrived on time, very efficient. Highly recommended.
I would recommend his services to anyone who needs an electrician.
Fantastic work, clean and tidy, understood exactly what I wanted. Well recommended.
Very responsive and knowledgeable — diagnosed the fault, including tidying up wiring a previous company had left in a state. Went above and beyond to ensure the fault was diagnosed and rectified.
Adam carried out an EICR on our property and I was really impressed with his service. Communication was excellent from start to finish, he was transparent with pricing, and provided a clear breakdown of any issues.
Really impressed by the level of service I received. I needed 2 sockets moving and called for a quote — I had a quote the same day and a clear outline of what would happen and when. Everything happened exactly as organised.
Had a problem on a Sunday morning — by Sunday afternoon it was sorted. Found the problem straight away. Polite and well mannered, would certainly recommend him to anyone.
Last minute call-out. Prompt, courteous and explained what he was doing and why, every step of the way. Now using plug sockets that three other electricians couldn't fix. 10/10.
Excellent job, very knowledgeable and high standard of quality. Would recommend to anyone requiring electrical work!
Sedgley property tends to come with something extra attached — a cellar, a detached garage, a workshop or a garden room that gained a supply at some point without much ceremony. A fuse box replacement in Sedgley is the sensible moment to look at all of it together, because the main board is where every one of those supplies begins.
Ask us to price a new consumer unit in Sedgley — along with the cellar, garage or garden room hanging off it. There is no charge for the quote.
All work is completed by qualified and certified electricians, with relevant approvals and documentation provided where required.

